Battery storage · Facility operations · Roadmap

Facility operations beyond the EMS — for your battery-storage portfolio.

Site control, perimeter, fire-safety inspections, environmental compliance, vendor maintenance cycles, operations reporting — the facility-management layer your battery portfolio runs on. Battery telemetry, BMS data, dispatch, and grid-services optimisation stay in your EMS / trading stack.

What battery operators run into beyond the EMS

Dispatch lives in the EMS. Facility operations live nowhere.

Facility frictions beyond the EMS

app.basepro.io/battery-storage

Fire-safety + environmental cadence · 2026

8 inspections · 3 sites
SiteInspectionAuthorityNext dueLast passedOwnerStatus
BS-NL-02Fire-safetyLocal FD11 d2025-08-12LMdue soon
BS-NL-02Env. impactSEMARNAT48 d2025-06-04LMtracked
BS-DG-05Fire-safetyLocal FDoverdue2024-12-19RCescalated
BS-DG-05Interconn.CRE92 d2025-09-22RCtracked
BS-SO-09Thermal-mgmtInternal6 d2026-03-14ASdue soon
BS-SO-09Fire-safetyLocal FD142 d2026-01-08AStracked
Cadences tracked: 8Source: spreadsheetOverdue: 1Risk: permit violation

Fire-safety inspections, environmental impact filings, interconnection compliance — all on a calendar somewhere. Missed cadence is a permit violation. Most operators are running the calendar from a spreadsheet.

Site, perimeter, compliance — one record

Every site, every inspection, every vendor — one operating record.

Site records that carry the land lease, the fire-safety inspection calendar, the environmental compliance trail, and the vendor scope of work. Inspection alerts, vendor dispatch, invoice reconciliation. The facility-management layer of the battery portfolio, treated as the operational system it is — not as an addendum to the dispatch stack.

Owner-grade reporting from operations data

Sponsor and tax-equity reporting — assembled from live operations.

Maintenance trends by site, permit and inspection status, vendor performance, CAPEX vs budget — assembled from the live operations layer. Sponsor reports and tax-equity packs become one-click outputs, not quarter-end fire drills.

Roadmap surface · Review date 2026-12-31

This surface describes the facility-operations scope BasePro is building for battery-storage portfolios. It is on the roadmap, not in production. We commit to publishing the implementation status of every claim on this page by 2026-12-31. If the surface has not shipped or has materially changed by then, this page will be updated or removed. Join the waitlist below and we'll keep you in the loop as the substrate hardens.

Battery portfolios need an operations layer too.

If you operate a battery-storage portfolio and want to be in the cohort that shapes the facility-operations surface, the waitlist is open. Earliest sites onboard Q3 2026.